The modernization of existing substations, particularly where space is limited, requires precise planning and careful coordination of the individual reconstruction phases. Particular attention must be given to maintaining grid operation, operational safety, and personnel protection throughout the project.

FGS develops project-specific reconstruction concepts and uses modern 3D modelling to visualize the different construction and operational stages. This enables spatial constraints and dependencies to be identified at an early stage and temporary arrangements, interfaces, and construction sequences to be systematically incorporated into the planning process.

Reconstruction Sequence Planning
Development and coordination of individual reconstruction phases, taking into account the existing installation, available space, and project-specific operational requirements.

3D Modelling and Visualization
Three-dimensional representation of the different construction and system configurations to support technical planning, option assessment, and coordination with project stakeholders.

Interface Coordination
Consideration of technical and spatial interfaces between existing infrastructure, new installations, temporary arrangements, and adjacent systems.

Safety and Grid Operation
Integration of requirements relating to grid operation, system safety, and personnel protection into the development of the reconstruction sequence.

By combining technical engineering with 3D modelling, FGS provides a sound basis for the coordinated and safe implementation of complex substation modernization projects.

‍