Project Description:
As part of the voltage conversion project for the 220-kV Saturday-Zurich line, the existing transmission line is planned to be upgraded from 150 kV to 220 kV. This transition requires meticulous planning and the preparation of a comprehensive planning approval dossier to ensure compliance with all regulatory requirements.
Key Aspects of the Project:
- Voltage Conversion
Conversion of the transmission line from 150 kV to 220 kV to increase network capacity and meet rising energy demands. The voltage upgrade will be carried out in compliance with technical standards and safety regulations. - Planning Approval Dossier
Preparation of a comprehensive planning approval dossier for the voltage conversion. The dossier includes all necessary documentation, such as project plans, environmental impact assessments, technical specifications, and other relevant information. - Regulatory Compliance
Ensuring the planning approval dossier meets all regulatory requirements and standards. Close collaboration with relevant stakeholders and authorities to obtain the necessary approvals. - Technical Adjustments
Implementation of all necessary technical modifications to the line to support the higher voltage. - Environmental Compatibility
Consideration of environmental impacts and implementation of measures to minimize them. Adherence to environmental protection standards and sustainable practices.
For this project, FGS has been commissioned by AFRY Switzerland AG to handle planning, project engineering, and the preparation of the required planning approval documents.