Place
Bonaduz-Sils
Date
2023-2024
Services
Development of detailed Engineering, Preparation of Approval Documents, Drafting of Tender Documents, Construction Supervision, and Preparation of Final Documentation
The 380-kV line Bonaduz-Sils, constructed in 1960, primarily consists of Vögelimasten towers. To ensure long-term grid security, immediate measures are required. These include re-tensioning the conductors to their original tension on-site and replacing the old overhead line fittings in a specific section of approximately 2.4 km.
FGS has been commissioned by AFRY Switzerland AG for this project to handle planning, preparation of tender documents, coordination of construction preparation, and construction supervision.
For further questions or more detailed information, the Future Grid Solutions team is happy to assist.